Prepared by: - Er. Ghan Shyam Dhakal
1)
Check for slabs/Beam/Column
a.
Check the Beam/slab level in all direction.
b.
Shuttering surface must be sufficiently oiled.
c.
Distance between jacks (Profs) must be 1m not
more than 1.2m.
d.
Joints should be covered by masking tape to
avoid leakage of slurry.
2)
Check for Rebar
a.
Rebar should be as per as structural drawings.
c.
Sufficient lap length should be provided in
slab/beam as per drawings or IS456 code.
d.
Cross bars or concealed beam should be provided
at duct or opening in slab.
e.
Alignment of beam rebar should be checked.
f.
Reinforcement in beam should be in centre
position.
g.
Necessary cover should be provided in slab/beams/columns
as per IS code.
h.
Concrete chairs of min 12 mm dia. Bars should be
used.
i.
Check for spacing as per drawings or IS codes.
3)
Check for electrical
a.
Electrical points should be as per electrical
drawings.
b.
At joints it should be properly insulated by
tape.
c.
Good quality of pipes & fittings should be
used.
4)
Check for Plumbing /Sanitary
a.
Plumbing/sanitary points should be as per
plumbing/sanitary drawings.
b.
At joints it should be properly insulated by
glue and tape.
c.
Good quality of pipes & fittings should be
used.